Project Description

Project Description

Construction of a timber framed 151 bedroom Travelodge over a steel framed 8,000 sq ft retail unit block, over a steel and concrete framed basement car park, on the Mitchell Lane site in Redcliffe, Bristol.

Key Features

Basement car park constructed adjacent to the highway of three sides.
Flood protection measures required to protect the basement and ground floor.
Multi material elevation treatment required to comply with Planning Conditions.
Town centre location, requiring detailed planning and co ordination of all deliveries and works

Construction Details

Start Date: October 2010
Completion Date: September 2011
Duration: 48 Weeks
Project Value: £6.8m